This week we startwork on the central components of an elementary real-time operating system (RTOS) that divides the processor's time between separate user tasks. These tasks will need to communicate with the system, and will request its services by means of a 'software interrupt'.
Implementation of Software Interrupts A software interrupt is known as a 'trap'. It causes the processor to respond in a very similar way as it does to a hardware interrupt, and so allows system calls from the user program and interrupts from hardware devices to enter the operating system in a consistent way. There are 16 trap instructions available, numbered 0 to 15, and written trap #0 ... trap #15 Each of the 16 trap instructions may have its own interrupt service routine (ISR). After pushing the PC and SR, the processor then accesses a table in low memory, at address 80H. As for the hardware interrupts, the table contains a 4-byte value corresponding to the address of the ISR for each software interrupt. Vectors for the two types of interrupt will normally be combined into a single block of code.|
;interrupt vectors |
||
|
org |
$64 ;origin 64H |
|
|
hvec1 |
dc.l |
hisr1 ;address of hardware ISR 1 |
|
hvec2 |
dc.l |
hisr2 ; ... etc |
|
org |
$80 ;origin 80H |
|
|
svec0 |
dc.l |
sisr0 ;address of software ISR 0 |
|
svec1 |
dc.l |
sisr1 ; ... etc |
|
Address |
|
|
2000H |
Programme code |
|
2C00H |
Data |
|
3000H |
Top-of-stack |
is transferred to the ready list and the mutex remains at zero. If the mutex is zero and notask is waiting, the mutex is set to one. In either case, the requesting task remains on the ready list.
Parameters: None. 5. Initialise mutex Function: The mutex is set to the value 0 or 1, as specified in the parameter. Parameters: 0 or 1. 6. Wait time Function: The requesting task is placed onto the wait list until the passage of the number of timer interrupts specified in the parameter, when it is transferred back to the ready list. Parameters: Number of timer intervals to wait. An additional function is executed automatically at start-up, or if the user presses the reset button. System reset Function: The system is initialised: all internal variables are reset, and each TCB is marked as unused. A TCB for task T0 is then created, and T0 becomes the running task. A practical RTOS would also include the following functions. These are not required in your submissions, but they are mentioned here for completeness of these notes. 7. Wait I/O: Function: The requesting task is placed onto the wait list, until an interrupt signifies completion of an I/O operation, when the task is transferred back to the ready list. Parameters: None. 8. Allocate memory Function: For tasks that require a large amount of memory, it is more efficient to allocate it as required when the task runs. A large area of memory is therefore kept free within the system, and a block from it, of say 16 kbytes, is returned to the requesting task. If the request is satisfied, the requesting task remains on the ready list. If there is insufficient free memory available, then the requesting task is put on the wait list until memory is returned when another task terminates.Parameters: On return, the start address of the allocated memory is held in the parameter register.
The system assumes that a default user task, T0, is present. The system runs this task immediately after a reset. It will need to be located at a predetermined address, which will be coded into the reset function. Your system should be robust, and deal with errors in an intelligent way. For example, what if the user tries to create more tasks than there are available TCBs? Test programmes Test your system using the following programmes. You will recognise these as modified versions of the questions in last week's worksheet, this time running under your RTOS. 1. Testing create task and wait time functions.A stopwatch counts in seconds. It starts when button 0 is pressed and stops when the button is pressed again. The display shows two digits, and should be neatly formatted with unused digits blanked. It is programmed as follows.
Timer interrupts are set to 100ms. Task 0 starts task 1, and both tasks run concurrently. A shared variable running is held in a memory location, and is set by T1 and read by T0. T0 displays a 2- digit value on the 7-segment display, initialised to zero. If running is set, T0 increments the display, then waits for 10 time intervals, and then repeats. If running is not set, T0 does nothing. T1 tests pushbutton 0. Each time the button is pressed, running changes state. 2. Testing initialise mutex, wait mutex, and signal mutex functions. A radiation monitor contains two devices that each generate a pulse each time a particle of ionising radiation is detected. The system alternately samples each detector for 100 ms, and records the count, a and b, from each device. It also keeps a running total of the two counts, c = a + b. The system measures the time since it started, and after 8 seconds displays the average count per second between the two detectors, that is, (2c / 2) / 8, or c / 8. (Because it monitors each detector for only half the time, there is an implicit assumption that the total for that detector is twice its actual count.) If at anytime during the 8-second measurement interval the total count c exceeds a certain critical value, the system immediately displays a danger warning by lighting the RH LED, and then continues running for the remainder of the 8 seconds. The LH LED is used to indicate an internal error, as will be explained later. It would be convenient to indicate a detection by pressing a button, but since we need to test this system in real-time, and it is not possible to press the buttons hundreds of times per second, we will simulate a fast arrival rate of detection pulses simply by programming the system to increment the two counters continuously. The programming is as follows. Timer interrupts are set to 100ms. Three tasks run concurrently. After performing any initialisation, tasks 0 and 1 update the counters, either a and c, or b and c, using the following instruction sequence which is repeated continuously. move.l a,d0 add.l #1,d0 move.l d0,a move.l c,d0 add.l #1,d0 move.l d0,c At the end of this sequence, variable c is tested to determine whether it has exceeded the critical value, and if so, the RH LED is lit to indicate a danger condition. You will note that variable c is updated by both tasks, which are liable to interfere with each other. A mutex operation is therefore used to enforce exclusion and prevent simultaneous updates. A call to mutex wait should be placed before the three instructions that increment this variable, and a signal call at their end. Task 2 waits for 8 seconds, then displays the result c / 8 on the 7-segment display. (The division can be done by shifting; see the notes for week 1.) The result may be shown in hexadecimal, which avoids doing a conversion to decimals. This task also checks that the mutex functions have worked: if the final value of a + b - c > 1, then there has been an error and this is indicated by lighting the LH LED. Submitting the test programmes. Your test programmes should be included at the end of your RTOS code. Place both programmes together, calling them prog1 and prog2. At the start of the user code, put the following branch instructions. org usrcode bra prog1 ; bra prog2 By commenting out one of these instructions, as has been done for prog2 above, it is easy to select the other for running. This is a much better arrangement than keeping two versions of the RTOS, with a different test programme in each, or pasting each test programme into the RTOS whenever it is required. However, since both programmes will be assembled together, you will have to ensure that you use different identifier names within the two programmes. You could, for example, start all labels and variable names within prog1 with 'p1' and those in prog2 with 'p2'. Documentation This consists of a user manual. It will explain your system to a user, and will therefore focus on what it does and how to use it. It will include a brief overview of how the system works internally, but only to an extent that is required for the programmer to use the system correctly. It should be structured as follows. 1. A general description, including, for example: explanation of the principles of multitasking and time-slicing, and how they are implemented; description of the memory layout of the user tasks as shown above; explanation of the startup behaviour: a default task runs, which may then start other tasks. 2. An itemised description of each of the user functions and their parameters. Explain all aspects of the behaviour of each function that are of interest to the user. For example, when a new task is created, does it run immediately, or is it put at the end of the ready queue? What if two tasks are waiting for the sametime, and so become ready together? Your descriptions should also state how long each function takes to execute. This time should be quoted in terms of instructions, and may be within a specified range, e.g., a particular function might execute in 30 - 50 instructions. 3. A short note about your two test programmes. How do they demonstrate that the system is working? Were there any unresolved problems with them? With normal typeface and spacing (such as used here) it would be reasonable to expect a length of no more than five or six pages. Submission in .PDF format is preferred, but .DOC(X) is also acceptable.